• Skip to main content
  • Skip to footer

Smart Surfaces Policy Tracker

  • Search
  • Glossary
  • Best Practices
  • About
  • Help Desk

Anchorage Requirements for Vegetation Surrounding Utility Facilities

This rule establishes requirements for utility facilities that include: “All areas cleared in conjunction with the installation of a tower, except for the area within ten feet of the tower, shall be replanted with vegetation.”

Link:

  • 21.05.040, D6©

Policy Details:

Locale: Anchorage, Alaska [West]
Climate zone: Zone 7: Very Cold
Jurisdiction: Municipality [>150K]
Smart Surface(s): Trees, Green Stormwater Infrastructure
Policy Type(s): City Code

Citation:

21.05.040, D6©

Footer

National League of Cities logo
American Public Health Association logo
SSC logo
Sabin Center logo

Copyright © 2026 · Sabin Center for Climate Change Law