• Skip to main content
  • Skip to footer

Smart Surfaces Policy Tracker

  • Search
  • Glossary
  • Best Practices
  • About
  • Help Desk

Birmingham Stormwater Management Plan Requirement for Post-Construction Permits

This ordinance mandates that applications for post-construction stormwater permits must include detailed stormwater management plans, as specified in Section 4-9-36, and other necessary forms and certifications prepared by certified professionals. Similarly, requests for termination of such permits must include record drawings in compliance with Section 4-9-38. The Director retains the authority to request additional plans or reports to assess potential flood, drainage, or pollution impacts of stormwater systems.

Link:

  • Birmingham, AL Code of Ordinances Title 4, Chapter 9, Article C, Sec. 4-9-34

Policy Details:

Locale: Birmingham, Alabama [Southeast]
Climate zone: Zone 3A: Warm Humid
Jurisdiction: Municipality [>150K]
Smart Surface(s): Green Stormwater Infrastructure
Policy Type(s): City Code

Citation:

Birmingham, AL Code of Ordinances Title 4, Chapter 9, Article C, Sec. 4-9-34

Footer

National League of Cities logo
American Public Health Association logo
SSC logo
Sabin Center logo

Copyright © 2026 ยท Sabin Center for Climate Change Law