This ordinance mandates that applications for post-construction stormwater permits must include detailed stormwater management plans, as specified in Section 4-9-36, and other necessary forms and certifications prepared by certified professionals. Similarly, requests for termination of such permits must include record drawings in compliance with Section 4-9-38. The Director retains the authority to request additional plans or reports to assess potential flood, drainage, or pollution impacts of stormwater systems.
Policy Details:
Locale: Birmingham, Alabama [Southeast]
Climate zone: Zone 3A: Warm Humid
Jurisdiction: Municipality [>150K]
Smart Surface(s): Green Stormwater Infrastructure
Policy Type(s): City Code
Citation:
Birmingham, AL Code of Ordinances Title 4, Chapter 9, Article C, Sec. 4-9-34




