• Skip to main content
  • Skip to footer

Smart Surfaces Policy Tracker

  • Search
  • Glossary
  • Best Practices
  • About
  • Help Desk

Boaz Best Management Practices (BMPs) Included in Erosion Control Plan Requirements

This ordinance requires an erosion and sediment control plan for subdivisions that incorporates Best Management Practices (BMPs) to minimize pollutants in stormwater runoff.

Link:

  • Boaz, AL Code of Ordinances Appendix B, Article 3, Sec. 3-10

Policy Details:

Locale: Boaz, Alabama [Southeast]
Climate zone: Zone 3A: Warm Humid
Jurisdiction: Municipality [<50K]
Smart Surface(s): Green Stormwater Infrastructure, Habitat Spaces, Urban Meadows, Wetlands, Green Roofs, Permeable Pavement , Trees
Policy Type(s): City Code

Citation:

Boaz, AL Code of Ordinances Appendix B, Article 3, Sec. 3-10

Footer

National League of Cities logo
American Public Health Association logo
SSC logo
Sabin Center logo

Copyright © 2026 · Sabin Center for Climate Change Law