Sacramento City Code section 15.08.180 outlines an expedited building permit process for small residential rooftop solar. The section allows an application for such a permit to be submitted by email, and requires only one inspection unless a first inspection is failed.
Policy Details:
Locale: Sacramento, California [West]
Climate zone: Zone 3B: Warm Dry
Jurisdiction: Municipality [>150K]
Smart Surface(s): Solar Photovoltaic Roof
Citation:
Sacramento City Code § 15.08.180




