Post-construction stormwater management (PCSWM) ensures long-term measures, including structural and non-structural Best Management Practices (BMPs), are implemented to prevent water quality impacts and maintain pre-construction runoff conditions. Structural BMPs such as detention devices, rain gardens, porous pavement, and constructed wetlands are supported alongside non-structural measures like conservation easements and stream buffers. Plans must address design for up to a 25-year storm event, long-term maintenance responsibilities, and annual inspections.
Policy Details:
Locale: Jacksonville, Alabama [Southeast]
Climate zone: Zone 3A: Warm Humid
Jurisdiction: Municipality [<50K]
Smart Surface(s): Green Stormwater Infrastructure, Habitat Spaces, Urban Meadows, Wetlands, Green Roofs, Permeable Pavement , Trees
Policy Type(s): City Code
Citation:
Jacksonville, AL Code of Ordinances, Ch. 12, Art. III, Sec. 12-112




